Senate President Sherwin Gatchalian said on Tuesday, November 3, the Senate will remove 295 infrastructure projects worth P8.836-billion from the proposed 2027 national budget.
Senate President Sherwin Gatchalian (Facebook)
Gatchalian cited missing necessary documentation from the Department of Public Works and Highways (DPWH) as a reason for removing these items from next year’s national spending plan.
“The Senate is committed unequivocally in weeding out unsubstantiated line items, including those lacking concrete and verifiable technical support, to ensure that every item in the final version is shovel-ready,” Gatchalian said in a statement.
“Unverifiable line items will not receive a single peso of public funding,” he emphasized.
The Senate leader made the pronouncement following a letter from former DPWH Secretary Vince Dizon which disclosed that 295 projects were found to be “non-compliant” based on evaluation conducted by the agency.
The evaluation was triggered by eight (8) types of “red-flags” that he pointed out during the recent Senate hearing on the DPWH’s proposed budget for 2027.
During that hearing, Gatchalian disclosed that more than 62 percent or 7,107 projects out of the total 11,395 infrastructure projects reviewed by his office, had at least one major budgetary red flag.
He pointed to projects that lack station numbers and geographical coordinatees, lump-sum projects, overlapping or fragmented projects, those with conflicting types of work, as an example. The “red flags” identified by the senator were from a review of projects included in the National Expenditure Program (NEP).
Gatchalian vowed that the Senate will be exercising zero-tolerance for infrastructure line items lacking technical support.
“The Senate’s mandate is clear: no supporting documents, no funds,” the Senate chief said.
“We must ensure there is no room for the abuse of public funds—especially now, when the economy is moving sluggishly and every peso is crucial to revitalizing it,” he stressed.
— Hannah L. Torregoza